Project Login
Registration No:
Password:
MAIL ALERTS SMS ALERTS
 
     
   
     

Blood Donation Agent

Platform : DOT NET

Title of Blood Donation Agent 1. the project: Blood Donation Agent 2. Domain: Health 3. Sub Domain: Blood Management Division 4. Project Architecture: N-Tire Architecture 5. SDLC methodologies: Waterfall model 6. Abstract of the project: This project is aimed to help the patients seeking for fresh blood at a particular location. This is basically a charity work to help peoples of India. This is not a blood bank and our client is not interested in blood stocking instead, we are stocking blood donors who are interested in donating blood at a particular location. The software is fully integrated with CRM (Customer Relationship Management) as well as CMS (Content Management System) solution and developed in a manner that is easily manageable, time saving and relieving one from manual works. 7. Requirements: 1) A web place where people interested in donating blood can register. 2) A web page where patients or blood consumers can post their blood request or a method by which people seeking blood can make a call. 3) A web page where people can search popular Blood Banks in a location. 4) A web page where people can search popular Hospitals in a location. 5) A web page where people can search popular Doctors in a location. 6) A method to designate blood donors as Silver/Gold Members. 7) A Page to provide Blood Donation tips. 8) A Web Place where site owner can manage: a. Site Members b. Blood Banks c. Hospitals d. Doctors e. Locations 9) Pages to provide other related information. 8. Deliverables: • Home Page • About Us Page • Contact Us page • Sitemap Page • Gallery Page • Other Info Pages o What is Blood Donation? o Why Blood Donation? o Ten Key points o What is Plasma Donation? o Do’s and Don’ts Before Blood Donation o Do’s and Don’ts After Blood Donation o Health Tips • Blood Banks Page • Hospital Page • Doctors Page • Donor Registration Page • Patient(Blood Seeker) Registration Page • Admin Pages o Manage Donors o Manage Blood Banks o Manage Hospitals o Manage Locations o Email notification to members. 9. Keywords: • Generic Technology keywords: Databases, User Interface, Programming • Specific Technology keywords: ASP.Net, C#.Net, MS SQL Server • Project type keywords: Analysis, Design, Implementation, Testing 10. Environment: • Servers: Operating System Server: - Microsoft Windows 2000 or Higher Data Base Server: Microsoft SQL Server 2000/2005 • Clients: Microsoft Internet Explorer, • Tools: Microsoft Visual Studio .Net • User Interface: ASP.NET with AJAX • Code Behind: VC#.NET 11. Requirements: • Hardware requirements: Number Description 1 PC with 2 GB hard-disk and 256 MB RAM • Software requirements: Number Description 1 Windows 2000/ XP/ or Higher with MS-office 2. MS-SQL server2000/2005 3. Ms-Visual Studio .Net 2005 4. Ms-Internet Explorer • Manpower requirements: 3 to 4 Developers can complete this in 3-4 months. 12. Milestones: No. Milestone Name Milestone Description Remarks 1 Requirements Specification Complete specification of the system including defining hierarchies constitutes this milestone. A document detailing the same should be written and a presentation on that be made. Attempt should be made to add some more relevant functionality other than those that are listed in this document. 2 Technology familiarization Understanding of the technology needed to implement the project. The presentation should be from the point of view of being able to apply it to the project, rather than from a theoretical perspective. 3 Database creation A database of at least 10 entries of users with at least 1 should application admin. It is important to finalize on the database at this stage itself so that development and testing can proceed with the actual database itself. 4 High-level and Detailed Design Listing down all possible scenarios and then coming up with flow-charts or pseudo code to handle the scenario. The scenarios should map to the requirement specification 5 Development of front end functionalities. Implementation of the main screen giving the login, screen that follows the login giving various options, screens for each of the options During this milestone period, it would be a good idea for the team to start working on a test-plan for the entire system. This test-plan can be updated as and when new scenarios come to mind. 6 Integrating the front-end with the database The front-end developed in the earlier milestone will now be able to update the database. Other features should be functional at this stage. In short, the system should be ready for integration testing. 7 Integration Testing The system should be thoroughly tested by running all the test cases written for the system (from milestone 5). Another 2 weeks should be there to handle any issues found during testing of the system. After that, the final demo can be arranged. 8 Final Review Issues found during the previous milestone are fixed and the system is ready for the final review. During the final review of the project, it should be checked that all the requirements specified during milestone number 1 are fulfilled 13. The following steps will be helpful to start off the project: • Study and be comfortable with technologies such as: ASP.Net with C#, and SQL Server. • Gather some knowledge of product hierarchies and maintenance before starting the design. • Create a user database with different access levels. • Start with creating the login screen. • Create menus for navigation and group the functionalities as sub menus. • Create the help-pages of the application in the form of FAQ. This will helps user.

NOW GET PROJECTS ! GET TRAINED ! GET PLACED !

IEEE, NON-IEEE, REAL TIME LIVE ACADEMIC PROJECTS,

PROJECTS WITH COMPLETE COURSES,SOFT SKILLS & PLACEMENTS

ALLOVER INDIA & WORLD WIDE,

HOSTEL FACILITY AVAILABLE FOR GIRLS & BOYS SEPARATELY,

CALL: 08985129129 ,  E-Mail Id: support@ascentit.in

REGISTER FOR PROJECTS NOW ! GET DISCOUNT
   
1