Project Login
Registration No:
Password:
MAIL ALERTS SMS ALERTS
 
     
   
     

E-Shopping

Platform : DOT NET

E-Shopping Title of the project: E-Shopping Domain: Open Industry Sub Domain: Finance and Account Division Project Architecture: N-Tire Architecture SDLC methodologies: Waterfall model Abstract of the project: Eshopping is an Internet based Online Shopping Mall, which deals with Customer placing an Order for products on line and transactions for ordered products. It deals with Inventory, generation and also Stock checking for the ordered products. Module specification The enterprise application integration for e-shopping site has five main modules Registration module Computer store Music center Garments Administrator module Registration module: In the registration module users can register their names in to the site. And each user has their own user id and password, by their id and password users can login in to site. Computer store: It contains detailed information about computer peripherals, and all available computer peripheral images with appropriate rates. Computer store contains about the fallowing information. Monitors Laptops Printers Cables Routers Modems Music center: It contains detailed information about music peripherals, and all available music peripheral images with appropriate rates. Music store contains about the fallowing information. VCD players TCD players Musical instruments STD musical instruments Garments: It contains detailed information about garments, and all available garments images with appropriate rates. Garments contains about the fallowing information. Jackets Shirts T-shirts Pants. Administration module: Administration module is one of the important modules in this site. Administrator has the authority to modify whole database of this site. Administrators have their own id and password to login the site. administrator is able to give proper security for this site. . Keywords: Generic Technology Keywords: Databases, User Interface, Programming Specific Technology Keywords: ASP.Net, C#.Net, MS SQL Server Project Type Keywords: Analysis, Design, Implementation, Testing SDLC Keywords: Presentation, Business, Data Access Layers Environment: Servers: · Operating System Server: - Microsoft Windows 2000 or Higher · Data Base Server: Microsoft SQL Server 2000/2005 Clients: Microsoft Internet Explorer, Tools: Microsoft Visual Studio .Net User Interface: ASP.NET with AJAX Code Behind: VC#.NET Requirements: Hardware requirements: Number Description 1 PC with 2 GB hard-disk and 256 MB RAM Software requirements: Number Description 1 Windows 2000/ XP/ or Higher with MS-office 2. MS-SQL server2000/2005 3. Ms-Visual Studio .Net 2005 4. Ms-Internet Explorer Manpower requirements: 3 to 4 Developers can complete this in 3-4 months. Milestones: No. Milestone Name Milestone Description Remarks 1 Requirements Specification Complete specification of the system including defining hierarchies constitutes this milestone. A document detailing the same should be written and a presentation on that be made. Attempt should be made to add some more relevant functionality other than those that are listed in this document. 2 Technology familiarization Understanding of the technology needed to implement the project. The presentation should be from the point of view of being able to apply it to the project, rather than from a theoretical perspective. 3 Database creation A database of at least 10 entries of users with at least 1 should application admin. It is important to finalize on the database at this stage itself so that development and testing can proceed with the actual database itself. 4 High-level and Detailed Design Listing down all possible scenarios and then coming up with flow-charts or pseudo code to handle the scenario. The scenarios should map to the requirement specification 5 Development of front end functionalities. Implementation of the main screen giving the login, screen that follows the login giving various options, screens for each of the options During this milestone period, it would be a good idea for the team to start working on a test-plan for the entire system. This test-plan can be updated as and when new scenarios come to mind. 6 Integrating the front-end with the database The front-end developed in the earlier milestone will now be able to update the database. Other features should be functional at this stage. In short, the system should be ready for integration testing. 7 Integration Testing The system should be thoroughly tested by running all the test cases written for the system (from milestone 5). Another 2 weeks should be there to handle any issues found during testing of the system. After that, the final demo can be arranged. 8 Final Review Issues found during the previous milestone are fixed and the system is ready for the final review. During the final review of the project, it should be checked that all the requirements specified during milestone number 1 are fulfilled The following steps will be helpful to start off the project: Study and be comfortable with technologies such as: ASP.Net with C#, and SQL Server. Gather some knowledge of product hierarchies and maintenance before starting the design. Create a user database with different access levels. Start with creating the login screen. Create menus for navigation and group the functionalities as sub menus. Create the help-pages of the application in the form of FAQ. This will helps user.

NOW GET PROJECTS ! GET TRAINED ! GET PLACED !

IEEE, NON-IEEE, REAL TIME LIVE ACADEMIC PROJECTS,

PROJECTS WITH COMPLETE COURSES,SOFT SKILLS & PLACEMENTS

ALLOVER INDIA & WORLD WIDE,

HOSTEL FACILITY AVAILABLE FOR GIRLS & BOYS SEPARATELY,

CALL: 08985129129 ,  E-Mail Id: support@ascentit.in

REGISTER FOR PROJECTS NOW ! GET DISCOUNT
   
1