Project Login
Registration No:
Password:
MAIL ALERTS SMS ALERTS
 
     
   
     

Global-Navigator

Platform : DOT NET

Global-Navigator Development of feature-rich Mobile based Path Finder System Title of the project: Global-Navigator Domain Name: Pocket PC Abstract of the project: Global-Navigator is a GPS application suitable for the real world, which harnessed the power of GPS satellites to determine the current location, synchronize the computer clock to atomic time, and point to a satellite on a cloudy day. The interpreter also works with hand-held devices and supports international developers. Global-Navigator is smart enough to be used in-car navigation and reliable enough for commercial use. Functional components of the project: Global-Navigator is using GPS satellite signals for different commercial and non-commercial use. There are several ways to distort a GPS satellite signal. Some are corrected by the Department of Defense and others can be corrected in your GPS receiver using real-time ground station correction signals. The only precision problem, which is left to you to control, is Geometric Dilution of Precision. Controlling GDOP is the key to writing commercial-grade GPS applications. A small mathematical formula can be applied to determine the maximum allowable DOP for a particular application. The maximum allowable error should be the greatest possible value, which minimizes accuracy problems while maximizing operational conditions. Another factor, which helps developers, is time itself. Advances in GPS receiver technology are pushing precision to new levels. While precision can be questionable with any consumer GPS device, there will soon be a time when precision to a centimeter is possible. I believe that this level of precision will cause a revolution in industry and pave the way for some truly amazing things: automated construction machines, tracking for every shipping container in the world, traffic control systems that actively prevent traffic jams... and self-guiding golf balls. Keywords: Generic Technology keywords: Databases, User Interface, Programming Specific Technology keywords: ASP.Net, C#.Net, MS SQL Server Project type keywords: Analysis, Design, Implementation, Testing Environment: Servers: Operating System Server: - Win CE Data Base Server: Microsoft SQL Server CE Clients: Mobile Browsers Tools: Microsoft Visual Studio .Net User Interface: ASP.NET with AJAX Code Behind: VC#.NET Requirements: Hardware requirements: Number Description 1 PC with 2 GB hard-disk and 256 MB RAM Software requirements: Number Description 1 Windows CE. 2. MS-SQL server CE 3. Ms-Visual Studio .Net 2005 4. Mobile Browser. Milestones: No. Milestone Name Milestone Description Remarks 1 Requirements Specification Complete specification of the system including defining hierarchies constitutes this milestone. A document detailing the same should be written and a presentation on that be made. Attempt should be made to add some more relevant functionality other than those that are listed in this document. 2 Technology familiarization Understanding of the technology needed to implement the project. The presentation should be from the point of view of being able to apply it to the project, rather than from a theoretical perspective. 3 Database creation A database of at least 10 entries of users with at least 1 should application admin. It is important to finalize on the database at this stage itself so that development and testing can proceed with the actual database itself. 4 High-level and Detailed Design Listing down all possible scenarios and then coming up with flow-charts or pseudo code to handle the scenario. The scenarios should map to the requirement specification 5 Development of front end functionalities. Implementation of the main screen giving the login, screen that follows the login giving various options, screens for each of the options During this milestone period, it would be a good idea for the team to start working on a test-plan for the entire system. This test-plan can be updated as and when new scenarios come to mind. 6 Integrating the front-end with the database The front-end developed in the earlier milestone will now be able to update the database. Other features should be functional at this stage. In short, the system should be ready for integration testing. 7 Integration Testing The system should be thoroughly tested by running all the test cases written for the system (from milestone 5). Another 2 weeks should be there to handle any issues found during testing of the system. After that, the final demo can be arranged. 8 Final Review Issues found during the previous milestone are fixed and the system is ready for the final review. During the final review of the project, it should be checked that all the requirements specified during milestone number 1 are fulfilled The following steps will be helpful to start off the project: Study and be comfortable with technologies such as: ASP.Net with C#, and SQL Server. Gather some knowledge of related technology and maintenance before starting the design. Create a user database with different access levels. Start with creating the login screen. Create menus for navigation and group the functionalities as sub menus. Create the help-pages of the application in the form of FAQ. This will helps user.

NOW GET PROJECTS ! GET TRAINED ! GET PLACED !

IEEE, NON-IEEE, REAL TIME LIVE ACADEMIC PROJECTS,

PROJECTS WITH COMPLETE COURSES,SOFT SKILLS & PLACEMENTS

ALLOVER INDIA & WORLD WIDE,

HOSTEL FACILITY AVAILABLE FOR GIRLS & BOYS SEPARATELY,

CALL: 08985129129 ,  E-Mail Id: support@ascentit.in

REGISTER FOR PROJECTS NOW ! GET DISCOUNT
   
1